CC
BuildCalc
Advanced Construction Cost & Material Estimator (Tamil / English)
Language
Free helper • Rough estimate only

House • Duplex • Independent Home

Advanced Construction Cost & Material Estimator

Enter your plot size, number of floors and construction quality. The tool shows approx construction cost with split, labour, contingency and material quantities – easy to explain in Tamil & English.

Sq.ft based cost estimate Civil • Finishing • Electrical • Plumbing • Labour Rough material quantities & cost
1

Inputs

Plot size, floors, quality, rate mode.

2

Built-up & Cost

Sq.ft area × rate → total construction cost.

3

Split & Materials

Civil, finishing, labour, contingency + material quantities.

Enter your plot & building details

You can copy values from your land calculator – the tool converts internally to Sq.ft.

Example: Ground only = 1, G+1 = 2, G+2 = 3, etc.

Typical residential buildings use 80–90% after setbacks, staircase, open space.

These are thumb-rule rates. Local market, soil, elevation and brand selection can change final cost.

For quick use keep “standard”. To match your market, switch to custom and edit values.

Custom rate & material price (optional)

If empty, quality-wise standard rate will be used.

Material Unit price (₹) Unit
Cement bag Per 50kg bag
Steel Per kg
Sand Per cubic feet
Brick Per piece

Change these if your local material prices are different.

Built-up area = Plot area (Sq.ft) × Floors × Coverage% / 100.

Approx construction cost

Enter details and click calculate to see cost & material estimate.

₹ –

Built-up area: –

Plot: – Floors: – Rate: –

Disclaimer: This is a high-level planner, not an engineering quote. Always confirm with a local structural engineer / contractor before final decisions.

Cost split by category

Civil & finishing from base cost, plus labour & contingency.

Category % share Amount (₹)
Cost split will show here after calculation.

Rough material quantities & cost

For planning / discussion only – not for tender.

Material Quantity Unit Cost (₹)
Cement, steel, sand & bricks will be listed here.

Labour & contingency overview

Labour cost

₹ –

Labour share

– %

Contingency & wastage

₹ –

Labour includes masonry, carpentry, painting, basic supervision. Contingency covers price fluctuation, minor design changes, etc.

Thumb rules used: ~0.45 cement bag / Sq.ft, 4.5 kg steel / Sq.ft, 0.9 cft sand / Sq.ft, 8 bricks / Sq.ft (adjust in code as per your region preference).