Approx construction cost
Enter details and click calculate to see cost & material estimate.
₹ –
Built-up area: –
Disclaimer: This is a high-level planner, not an engineering quote. Always confirm with a local structural engineer / contractor before final decisions.
Cost split by category
Civil & finishing from base cost, plus labour & contingency.
| Category | % share | Amount (₹) |
|---|---|---|
| Cost split will show here after calculation. | ||
Rough material quantities & cost
For planning / discussion only – not for tender.
| Material | Quantity | Unit | Cost (₹) |
|---|---|---|---|
| Cement, steel, sand & bricks will be listed here. | |||
Labour & contingency overview
Labour cost
₹ –
Labour share
Contingency & wastage
₹ –
Labour includes masonry, carpentry, painting, basic supervision. Contingency covers price fluctuation, minor design changes, etc.
Thumb rules used: ~0.45 cement bag / Sq.ft, 4.5 kg steel / Sq.ft, 0.9 cft sand / Sq.ft, 8 bricks / Sq.ft (adjust in code as per your region preference).